News

Contact Us

  • Email:qdsw87@qdswsteel.cn
  • Address:Room 3109, Building 2, No. 39 Shiling Rd, Qingdao, China
  • Mobile:0086-18669803758
  • Tel:0086-18669803758

integrated sewage wastewater treatment equipment in food factory

integrated sewage wastewater treatment equipment in food factory


integrated sewage wastewater treatment equipment in food factory

Description


integrated sewage wastewater treatment equipment in food factory

integrated sewage wastewater treatment equipment in food factory

integrated sewage wastewater treatment equipment in food factory

integrated sewage wastewater treatment equipment in food factory

JCH carbon steel integrated sewage treatment equipment:


Carbon steel integrated sewage treatment equipment is a water production process that combines biological treatment technology and membrane separation technology, which can effectively carry out solid-liquid separation and obtain directly used stable reclaimed water. Effectively remove ammonia nitrogen, suspended matter in effluent, turbidity close to zero, has the advantages of low energy consumption and small footprint.


JCH FRP integrated sewage treatment equipment:


FRP integrated sewage treatment equipment adopts the world's advanced biological treatment process, which integrates the removal of BOD5, COD and NH3-N. It is widely used in domestic sewage of high-end hotels, villas and residential quarters and similar Industrial organic sewage treatment replaces septic tanks with a low removal rate, and the effluent after treatment cannot meet the national comprehensive discharge standard. Field application shows that JCT type FRP series integrated sewage treatment equipment is a kind of equipment with very ideal treatment effect, strong durability and convenient management.


integrated sewage wastewater treatment equipment in food factory


integrated sewage wastewater treatment equipment in food factory



Parameter


integrated sewage wastewater treatment equipment in food factory

(1) It can be buried below the ground surface, the device does not occupy the surface area of the ground, it does not need to build a house, and it

does not need heating and insulation;

(2) It consists of two sets of steel structure equipment, which is anti-corrosive paint. The antiseptic life can reach more than 15 years;

(3) The AO biological treatment process uses a push-flow biological contact oxidation tank, which can improve the solubility of oxygen in the air in water.

The volume load of the filler is relatively low, and the microorganisms are in their own oxidation stage, so the amount of sludge produced is small,

and it generally only takes about 90 days to drain the sludge.

(4) In order to reduce the impact of noise on the surrounding environment, the blower equipment adopts noise reduction measures such as vibration isolation pads and silencers;

(5) The fully automatic electrical control system and equipment damage alarm system have good reliability, so they are generally no special staff is required,

only monthly or quarterly repairs and maintenance.

You can leave us a message here, we will contact you soon

Contact Us

Add: Room 3109, Building 2, No. 39 Shiling Rd, Qingdao, China
Tel: 0086-18669803758
Mobile: 0086-18669803758
0.025296s